Arkansas Valley

Arkansas Valley Conduit

The final original component of the Fryingpan-Arkansas Project — a pipeline delivering clean, reliable drinking water to roughly 50,000 people across southeastern Colorado communities that have relied on hard, and sometimes contaminated, groundwater for decades.
Project Details →
FryArk Photos JWB Hydro Ex 10

Hydropower Plant

The Southeastern District has finished construction of the Hydropower Plant at Pueblo Dam, and commercial operations began on May 28, 2019. The plant provides the District’s Enterprise Activity with a new revenue stream. The plant is the first hydroelectric feature added to the Fryingpan-Arkansas Project since the completion of the Mount Elbert pump-back hydroelectric plant at Twin Lakes in 1981.
Project Details →
20230906 Fry Ark Collection Actuators Fry Diversion

Asset Valuation and Condition Assessment

The District completed an Asset Valuation and Condition Assessment in 2022. These reports inform the District of capital needs for the Fryingpan-Arkansas Project, District Headquarters and Hydropower Plant at Pueblo Dam. The District works with the Bureau of Reclamation to identify improvements that are needed. In 2026, the District collaborated with the Bureau of Reclamations to make improvements in the South Side collection system.
Project Details →
Pueblo Dam and REservoir aerial for web page (Custom)

Enlargement

The District recognizes the potential need for enlarging the reservoirs through strategic planning. The Enlargement project consists of enlarging existing Fry-Ark Project reservoirs in order to help meet the full demand for additional water storage.
Project Details →
FryArk Photos Pueblo Dam 10

Excess Capacity Master Contract

The Excess Capacity Master Contract (Contract) allows participants to store water in Pueblo Reservoir when the space is not needed for Fryingpan-Arkansas Project (Project) Water.
Project Details →
ARBWF 250306 Tour Pueblo Dam 5 (1)

Recovery of Storage

Pueblo Reservoir opened in 1975 and has been a wonderful amenity for all of Southeastern Colorado.
Project Details →
Pueblo Reservoir 2022 Photo for Web Page (Custom)

Water Sales and Storage

The Southern Colorado Water Activity Enterprise annually sells Fryingpan-Arkansas Project Water for Municipal & Domestic or Irrigation Use.
Project Details →
Fry Ark system photo

Fry-Ark Project

The Fryingpan-Arkansas Project (Fry-Ark) is a massive federal water diversion, storage, and delivery system that moves water from the Western Slope of the Rocky Mountains across the Continental Divide to the arid plains of southeastern Colorado. Authorized by President John F. Kennedy in 1962 and constructed primarily between 1964 and 1981, the project is owned and operated by the Bureau of Reclamation alongside the Southeastern Colorado Water Conservancy District.