The 7.5-megawatt facility will be able to generate electricity at flows ranging from 35-810 cubic feet per second. Three turbines and two generators use the Dam’s authorized releases to the Arkansas River to generate an annual average 28 million kilowatt hours (kWh) of power, and approximately $1,500,000 in average revenue per year. The project’s total capital cost is $20.2 million, which includes a $17.2 million loan from the Colorado Water Conservation Board (CWCB). Revenues from the hydro plant will repay the District’s Enterprise Activity and the CWCB loans, then support the Arkansas Valley Conduit OM&R costs.
Hydroelectric power is generated by falling water flowing through turbines. No water is consumed during the generation of electricity. The Broderick plant connects to the Municipal Service Line constructed by Colorado Springs Utilities for the Southern Delivery System at the North Outlet Works. The U.S. Bureau of Reclamation now owns the Municipal Service Line. Reclamation granted the District a Lease of Power Privilege in 2017, following a planning and permit process that began in 2011. Colorado Springs Utilities and the Pueblo Board of Water Works were originally partners, but the project is being solely undertaken by the District.
The City of Fountain and Colorado Springs Utilities (for use at Fort Carson) purchase the power generated. After 10 years, Fountain will purchase all of the power generated by the plant for the following 20 years. These utilities are looking for ways to broaden their energy portfolios to include clean, renewable energy. Energy costs for Fountain, which purchases all of its power, is actually reduced.
Southeastern Colorado Water Conservancy District
31717 United Avenue
Pueblo, CO 81001
Phone: 719-948-2400
email: hunter@secwd.com