In 1859 the discovery of gold in the Arkansas River valley brought many settlers to the area, but few were successful in their search for wealth. More and more gold seekers turned to farming to provide for themselves and their families. As permanent settlements were established, normal rainfall proved inadequate for farming and the era of irrigation development began. Early irrigation in the valley depended on available stream runoff from the Arkansas River and its tributaries.
After years of drought and hardship, the residents of the Arkansas Valley sought government aid to plan and develop a project which would regulate existing water supplies for more efficient use and provide additional storage capacity for the conservation of water from floods, reservoir space for storage, and new water supplies.
For more than three decades, beginning in the 1920’s, community leaders and irrigators began pushing heavily for a project to bring water from the western slope, with its abundant snowfall and sparse population, to the Arkansas River basin, where irrigated agriculture and city water systems depended on a river that often was only a trickle by the time it reached the state line.
The popular shorthand for the project became the Fryingpan-Arkansas Project. The name took on even more significance when backers of the Project began peddling golden frying pans in the 1950’s up and down the Arkansas valley to raise money for the lobbying effort that was soon to come
The sale of golden frying pans in the valley was brisk. Burros were used to carry the frying pans to towns up and down the Arkansas valley. During Water Week in January of 1955 groups were able to buy small frying pans for $5 and large ones for $100 or more. More than $30,000 was raised by the end of the week. The money was used to send backers of the Project to Washington, D.C.
Representative J. Edgar Chenoweth faithfully led the fight for the Project in the House of Representatives through the 1950's. Year after year the struggle for approval remained the same; the project passed the Senate but failed in the House.
Finally, on June 13, 1962, the House passed the Fryingpan-Arkansas Project. The Senate approved the Project on August 6, 1962. President John F. Kennedy signed the Project into law on August 16, 1962.
The Bureau of Reclamation (Reclamation) started construction on the Fryingpan- Arkansas Project beginning with Ruedi Dam and Reservoir in 1964. The Charles H. Boustead (Boustead) Tunnel, a 5-mile structure that transverses the Continental Divide and brings Project water from the western slope to the eastern slope, was built between 1965 and 1971.
Turquoise and Twin Lakes Reservoirs already existed, but from 1965-1968, Reclamation enlarged Turquoise Reservoir, raising Sugar Loaf Dam, and constructed the Mt. Elbert Conduit, which carries water from Turquoise to Twin Lakes. Work to enlarge Twin Lakes began in 1975. By then, Mt. Elbert Powerplant, the largest hydro-electric power plant in the State of Colorado, was being constructed on the northern shore. The enlargement and power plant were completed in 1981.
Pueblo Dam and Reservoir construction began in 1970 and was completed five years later. The first sale of Fryingpan-Arkansas Project trans-mountain water occurred in July 1972. Unit 1 of the Mt. Elbert Powerplant was made commercially available to the Western Area Power Administration in October 1981. Unit 2 came online in August 1984.
The Fountain Valley Conduit was completed in 1985 to pump water uphill to Colorado Springs, Fountain, Security, Widefield and Stratmoor Hills, collectively known as the Fountain Valley Authority.
Reclamation began construction in 1964 and continued without interruption until September 28, 1990, when the Project was completed with the dedication of the Fish Hatchery at Pueblo Reservoir. Construction is completed on all the water supply-related features that were expected to be initially developed.
Construction on the final piece of the Project, the Arkansas Valley Conduit, began in 2023. When completed, the Conduit will deliver clean drinking water to approximately 50,000 people in southeastern Colorado.
There are two distinct areas of the Project; the western slope, located in the Hunter Creek and Fryingpan River watersheds, and the eastern slope in the Arkansas River basin. These areas are separated by the Continental Divide, which in many places exceeds an elevation of 14,000 feet. The Project consists of diversion, conveyance, and storage facilities designed primarily to divert water from Colorado River tributaries on the western slope for use in the water-short areas in southeastern Colorado on the eastern slope.
The North and South Side Collection System and Ruedi Dam and Reservoir are located on the western slope in the Fryingpan River basin. Sugar Loaf Dam and Turquoise Lake, Mt. Elbert Conduit, Halfmoon Diversion Dam, Mt. Elbert Forebay Dam and Reservoir, Twin Lakes Dam and Reservoir, and Pueblo Dam and Reservoir are all located on the eastern slope in the Arkansas River basin.
East Slope Features
Turquoise Lake and Sugar Loaf Dam are located just east of the Continental Divide, approximately five miles west of Leadville, Colorado. Turquoise Lake provides storage capacity for the regulation of Project water delivered from the Boustead Tunnel, as well as contract waters which are not a part of the Project. After the Project water is used at the powerplant the water flows into Twin Lakes. From Twin Lakes Project water is released to Lake Creek and the Arkansas River for delivery to water users upstream of Pueblo Dam and Reservoir or storage in Pueblo Reservoir. The distance from the confluence of Lake Creek and Arkansas River to Pueblo Dam is approximately 143 river miles. Project water is released from Pueblo Reservoir to the Arkansas River for irrigation and municipal use. Pueblo Reservoir is the terminal storage feature for the Project.

The Mt. Elbert Conduit, a 10.7-mile, 90-inch diameter pipe, conveys water from Turquoise Lake to Mt. Elbert Forebay. Water delivered from the forebay is used to generate power at the Mt. Elbert Pumped-Storage Powerplant. The Mt. Elbert Pumped-Storage Powerplant is located approximately 13 miles southwest of Leadville, Colorado at the northwest corner of the lower lake of Twin Lakes. The powerplant has two pump-generator units, each with a capacity of 100 megawatts. The Halfmoon Diversion Dam diverts available flows to Halfmoon Creek into the Mt. Elbert Conduit.
Hydropower
Like a monument to its namesake, the Mt. Elbert Pumped-Storage Powerplant stands at the foot of Colorado's highest peak, the 14,422-foot Mt. Elbert. The building was designed along modern architectural lines. The all-concrete structure is equivalent to a 14-story building, though most of the structure is below ground.
The energy for power generation comes from water stored in the Mt. Elbert Forebay. This stored water drops an average of 445 feet through two pipes called penstocks to the Powerplant below. Force of the falling water spins two hydroelectric generators developing a total of 233 megawatts per hour of electrical power annually. This is enough power to serve the annual electrical needs of 26,200 homes. The generators are also designed to operate as a 170,000-horsepower electric motor which drives the turbines in reverse to pump the same water back up to the forebay so it can be used again to generate more power.
This pump-back storage principal is advantageous because the generating units can be started quickly, and adjustments of power output can be made rapidly to respond to varying patterns of daily and seasonal power demands.
West Slope Features
Ruedi Dam and Reservoir provides storage for replacement and regulation of water for the western slope users. The Project provides water for irrigation, municipal, industrial, recreation, and fish and wildlife purposes. The North and South Side Collection Systems on the western slope collect the high mountain runoff and convey the diverted waters into the inlet portal of the Charles H. Boustead Tunnel. Sixteen diversion structures on the western slope are used to divert water into the Project collection system. The system includes nineteen tunnels with a combined length of 29 miles. The five mile-long Boustead Tunnel conveys the water from the North and South Collection Systems under the Continental Divide to Turquoise Lake on the eastern slope.


Water for municipal and industrial use was developed by the Fryingpan-Arkansas Project to supplement existing supplies. Two separate water delivery pipeline systems, the Fountain Valley Conduit and the proposed Arkansas Valley Conduit, will serve communities on the eastern slope. The Fountain Valley Conduit extends north to deliver water to the Colorado Springs area. When it is built, the Arkansas Valley Conduit will transport clean water to users in the Arkansas Valley as far east as Lamar, Colorado.
Water diverted from the western slope and regulation of Arkansas River flows provides supplemental irrigation water for 250,000 irrigable acres in the Arkansas Valley. The Fryingpan-Arkansas Project enables farms to sustain and possibly increase the level of present agricultural productivity per acre. It permits farmers to diversify crops produced and to be more responsible to market demands for food and fiber. Because of the ability to diversify crops and meet peak irrigation demands, the value of total crop production in the Arkansas Valley has increased. Major crops grown include alfalfa, corn, and sorghum. Specialty crops such as onions, beans, tomatoes, melons, and seed crops are also grown in the valley
Like a monument to its namesake, the Mt. Elbert Pumped-Storage Powerplant stands at the foot of Colorado’s highest peak, the 14,422-foot Mt. Elbert. The building was designed along modern architectural lines. The all-concrete structure is equivalent to a 14-story building, though most of the structure is below ground.
The energy for power generation comes from water stored in the Mt. Elbert Forebay. This stored water drops an average of 445 feet through two pipes called penstocks to the Powerplant below. Force of the falling water spins two hydroelectric generators developing a total of 233 megawatts per hour of electrical power annually. This is enough power to serve the annual electrical needs of 26,200 homes. The generators are also designed to operate as a 170,000 horsepower electric motor which drives the turbines in reverse to pump the same water back up to the forebay so it can be used again to generate more power.
This pump-back storage principal is advantageous because the generating units can be started quickly, and adjustments of power output can be made rapidly to respond to varying patterns of daily and seasonal power demands.
Regulation of erratic and often destructive flood flows is a benefit of the Fryingpan-Arkansas Project. Seventy-eight persons died and damages exceeded $19 million when floodwater ravaged Pueblo in 1921. In 1965, flooding in the Fountain Creek area east of the City of Pueblo produced extensive damage. Flooding was reported as far as 90 miles downstream.
Fear of flooding has been reduced considerably with the construction of Pueblo Dam and Reservoir. The Reservoir has a reserved minimum capacity of 27,000 acre-feet for flood water storage.
The Arkansas River is one of the most popular rafting rivers in America and this 165 miles section of river is internationally recognized for its whitewater experience. From its headwaters at the historic mining area around Leadville, Colorado; through scenic mountain towns like Buena Vista and Salida, Colorado; to the breathtaking Royal Gorge and beyond Colorado's Arkansas River have some of the nation's most exciting whitewater and amazing mountain views. Rafting channels range from highly technical Class IV and V rapids to relaxing & scenic calm-water float trips. The Fryingpan-Arkansas Project has supported white-water recreational rafting for many years, through the Upper Arkansas Voluntary Flow Management Program.
The importance of maintaining, and where possible improving fish and wildlife habitat, was a major concern of those who designed the Fryingpan-Arkansas Project.
Dominant game fish found in Project area rivers, streams, and reservoirs on the western slope include rainbow, brown, cutthroat, and brook trout. Development of Ruedi Dam and Reservoir has increased the available reservoir fish habitat in the area. Operating criteria of the dam on the Fryingpan River has exposed about six acres of gravel area immediately below the dam which provide spawning beds for brown trout. The gravel area and regulated streamflow have improved the fishery below Ruedi Dam through increased natural reproduction and have increased recreation opportunities in the immediate area. The Fryingpan River below Ruedi Reservoir sports a gold-medal fishery.
Development of Turquoise Lake has increased the aquatic habitat and surface acreage available for fish. Species in this area include kokanee salmon, rainbow, brown, and lake trout. Both Twin Lakes and Turquoise Reservoirs are popular for ice-fishing. The increased fishing activity requires stocking about 16 tons of hatchery-reared fish each year.
The most common big game species within both the western and eastern slope areas are deer and elk. Big and small game hunting are allowed in these areas . To ensure big game migration, patterns were not permanently interrupted and all conduits in the collection system were buried.
The Mt. Elbert conduit delivers up to 3,000 gallons per minute of high quality water to the Leadville National Fish Hatchery. Increased fish production at the hatchery, is made possible by the increased quality and improved temperature of the water supply. To enhance recreation and fishing, the Bureau of Reclamation built a $22 million, state–of-the-art cold and warm-water fish hatchery just below Pueblo Dam. It is managed by the Colorado Parks and Wildlife and provides significant capability for the State to produce a variety of fish species to stock in its lakes and rivers.
The Fryingpan-Arkansas Project has awarded the constituents of the Southeastern Colorado Water Conservancy District 50 years of golden benefits (1965-2012). Looking forward to the next 50 years, the Fryingpan-Arkansas Project will continue to supply southeastern Colorado with these valuable benefits and more.
The District and the Bureau of Reclamation are planning the development and construction of the Arkansas Valley Conduit (Conduit). The Conduit is an original component of the Fryingpan-Arkansas Project but has not been built. When completed, the Conduit will deliver clean drinking water to approximately 50,000 people in southeastern Colorado.
The District is also pursuing legislation to enlarge both Sugar Loaf Dam on Turquoise Lake and Pueblo Dam. Enlarging these facilities will provide additional water storage space needed by the region.
A bright future filled with many more benefits lies ahead for the next 50 years for the Fryingpan-Arkansas Project and southeastern Colorado.